π± Garden: Seed-Starting (2026 Plan)
This page documents the full 2026 seed-starting and planting schedule for Sanford, NC
(Zone 7b/8a), including tomatoes, peppers, cucumbers, onions, beans, peas, squash,
and timing for all stages.
Overview
Location: Sanford, NC β Zone 7b/8a
Indoor Starts: Tomatoes, peppers, onions
Direct Sown: Cucumbers, beans, peas, zucchini, yellow squash
Main Beds / Areas
Tomatoes β *2 beds (4Γ8 each)*
Peppers β *1 bed (4Γ8)*
Onions β *1 dedicated 4Γ8 bed*
Cucumbers β *Edges of 2 beds on ramp trellis*
Beans β *Fence/trellis line*
Peas β *Fence/trellis line (cool season)*
Squash β *1 bed (4Γ8)*
Week-by-Week Seed Starting Schedule
January 10β25 β Start Onions Indoors
Varieties
Seed Details
Start in cells or open tray
Trim tops weekly to 4β5β
Harden off early (onions tolerate cool temps)
Transplant late Februaryβmid March
β
February 1β15 β Start Peppers Indoors
Varieties
Seed Details
β
February 15 β March 1 β Start Tomatoes Indoors
Varieties
Tropic
Amelia
Mountain Rouge
Mountain Merit
Celebrity
Roma VF
Mountain Magic (fence-row)
Independence Day (extra-early)
Mortgage Lifter (large heirloom)
Seed Details
β
March 10β20 β Potting Up (Indoors)
Move tomatoes & peppers to 4β pots
Tomatoes β bury stems deep
Peppers β do NOT bury stems deeper
Onions β keep trimmed; slowly reduce indoor heat
β
February 20 β March 15 β Transplant Onions Outdoors
April 5β15 β Harden Off Tomatoes
Begin with 1β2 hours shade
Slowly increase sun exposure
Protect from wind and cold nights
β
April 10β20 β Harden Off Peppers
April 15β25 β Transplant Tomatoes Outdoors
Night temps must be β₯ 50Β°F
Install trellises before planting
Place early tomato (*Independence Day*) in sunny spot
Place large heirloom (*Mortgage Lifter*) on strong support
β
April 25 β May 5 β Transplant Peppers Outdoors
February 10 β March 10 β Direct Sow Peas (Cool Season)
Variety
Notes
Plant as soon as soil is workable
Depth: 1β
Perfect for your fence line
Heat ends production β plant early
β
April 1 β May 15 β Direct Sow Pole Beans
April 20 β May 10 β Direct Sow Cucumbers (Round 1)
Varieties
Planting Notes
β
May 1β15 β Direct Sow Zucchini & Yellow Squash
Varieties
Dunja Zucchini
Multipik Yellow Squash
Planting Notes
β
July 10β20 β Replant Cucumbers (Round 2)
Varieties
Extends cucumber harvest into fall.
Quick Timeline Overview
| Month | Tasks |
| January | Start onions (10β25) |
| February | Start peppers (1β15), sow peas (10βMar 10), start tomatoes (15βMar 1) |
| March | Pot up seedlings (10β20), transplant onions (to Mar 15) |
| April | Harden off (5β20), transplant tomatoes (15β25), sow beans (1βMay 15), transplant peppers (25βMay 5), sow cucumbers (20βMay 10) |
| May | Sow zucchini & squash (1β15) |
| July | Replant cucumbers (10β20) |
Final 2026 Pepper List (4Γ8 Bed)
Total Plants: 12
Sweet Bells (10 total)
JalapeΓ±os (2 total)
Spacing
18β between plants
24β between rows
Support
Tomato Bed Layouts (Two 4Γ8 Beds)
BED A β Indeterminate / Vertical Rope System
BED A β 4Γ8 β Indeterminate / Vertical Rope System
β North (Back Row)
+------------------------- 8 ft -------------------------+
| |
| [Roma VF] [Roma VF] [Roma VF] [Roma VF] |
| |
|---------------------------------------------------------|
| |
| [Mountain Magic] [Mountain Magic] |
| [Tropic] [Tropic] |
| |
+---------------------------------------------------------+
Extra Options:
Mortgage Lifter (heirloom) can replace 1 Roma or go in a container
Independence Day (early) can be added at an end position for fast yield
Spacing
24" between plants
18" between rows
Trellis
Full-length 8 ft top bar
1 rope/string per plant
Weekly figure-8 wrap
Light pruning for Roma
BED B β Determinate Slicers (NC Winners)
BED B β 4Γ8 β Determinate Slicers (NC Winners)
β North (Back Row)
+------------------------- 8 ft -------------------------+
| |
| [Mountain Merit] [Mountain Merit] |
| [Mountain Merit] [Mountain Merit] |
| |
|---------------------------------------------------------|
| |
| [Mountain Fresh+] [Mountain Fresh+] |
| [Amelia F1] [Amelia F1] |
| |
+---------------------------------------------------------+
Spacing
20β24β between plants
18β between rows
Support
3β4 twine levels
Shorter vertical strings
Cucumber Trellis Layout (Bed Edges)
CUCUMBERS β Ramp Trellis (2 Bed Edges)
Round 1 β April 20 β May 10
Diva Γ 2
County Fair Improved Γ 2
Long Green Improved Γ 1 (new)
Round 2 β July 10 β 20
Replant Diva Γ 2
Replant County Fair Γ 2
Optional: Long Green Improved Γ 1
Notes
Depth: Β½βΒΎ"
Train immediately up trellis
Keep lower 8β10" pruned for airflow