This is an old revision of the document!
Table of Contents
π± Garden: Seed-Starting (2026 Plan)
This page documents the full 2026 seed-starting and planting schedule for Sanford, NC (Zone 7b/8a), including tomatoes, peppers, cucumbers, squash, and timing for all stages.
Overview
- Location: Sanford, NC β Zone 7b/8a
- Indoor Starts: Tomatoes & peppers
- Direct Sown: Cucumbers, zucchini, yellow squash
Main Beds
- Tomatoes β *2 beds (4Γ8 each)*
- Peppers β *1 bed (4Γ8)*
- Cucumbers β *Edges of 2 beds on ramp trellis*
- Squash β *1 bed (4Γ8)*
Week-by-Week Seed Starting Schedule
February 1β15 β Start Peppers Indoors
Varieties
- Sweet Bells
- Jalafuego
- King Arthur
- Red Knight
- Big Bertha
- Sweet Banana
Seed Details
- Depth: ΒΌβ
- Germination: 7β14 days
- Heat Mat: Yes (80β85Β°F)
β
February 15 β March 1 β Start Tomatoes Indoors
Varieties
- Tropic
- Amelia
- Mountain Rouge
- Mountain Merit
- Celebrity
- Roma VF
- Mountain Magic (fence-row)
Seed Details
- Depth: ΒΌβ
- Germination: 5β10 days
- Heat Mat: Recommended (75β80Β°F)
β
March 10β20 β Potting Up (Indoors)
- Move tomatoes & peppers to 4β pots
- Tomatoes β bury stems deep
- Peppers β do NOT bury stems deeper
β
April 5β15 β Harden Off Tomatoes
- Begin with 1β2 hours shade
- Slowly increase sun exposure
- Protect from wind and cold nights
β
April 10β20 β Harden Off Peppers
- Same process as tomatoes
- Peppers take longer β heat-loving
β
April 15β25 β Transplant Tomatoes Outdoors
- Night temps must be β₯ 50Β°F
- Install trellises before planting
β
April 25 β May 5 β Transplant Peppers Outdoors
- Night temps must be β₯ 55Β°F
- Stake immediately (bells get heavy)
β
April 20 β May 10 β Direct Sow Cucumbers (Round 1)
Varieties
- Diva
- County Fair Improved
Planting Notes
- Depth: Β½βΒΎβ
- Location: Base of ramp trellis
β
May 1β15 β Direct Sow Zucchini & Yellow Squash
Varieties
- Dunja Zucchini
- Multipik Yellow Squash
Planting Notes
- Depth: 1β
- Spacing: 36β40β
- Train vertically after 12β18β
β
July 10β20 β Replant Cucumbers (Round 2)
Varieties
- Replant Diva
- Replant County Fair Improved
Extends cucumber harvest into fall.
Quick Timeline Overview
| Month | Tasks |
|---|---|
| February | Start peppers (1β15), start tomatoes (15βMar 1) |
| March | Pot up seedlings (10β20) |
| April | Harden off (5β20), transplant tomatoes (15β25), transplant peppers (25βMay 5), sow cucumbers (20βMay 10) |
| May | Sow zucchini & squash (1β15) |
| July | Replant cucumbers (10β20) |
Final 2026 Pepper List (4Γ8 Bed)
Total Plants: 12
Sweet Bells (10 total)
- 2 Γ Red Knight (F1)
- 2 Γ King Arthur (F1)
- 2 Γ California Wonder 300
- 2 Γ Big Bertha (F1)
- 2 Γ Sweet Banana
JalapeΓ±os (2 total)
- 2 Γ Jalafuego (F1)
Spacing
- 18β between plants
- 24β between rows
Support
- Stakes or cages
- Bells get heavy β support early
Tomato Bed Layouts (Two 4Γ8 Beds)
BED A β Indeterminate / Vertical Rope System
```text
BED A β 4Γ8 β Indeterminate / Vertical Rope System
β North (Back Row)
+------------------------- 8 ft -------------------------+ | | | [Roma VF] [Roma VF] [Roma VF] [Roma VF] | | | |---------------------------------------------------------| | | | [Mountain Magic] [Mountain Magic] | | [Tropic] [Tropic] | | | +---------------------------------------------------------+ Spacing
24β between plants
18β between rows
Trellis
Full-length 8 ft top bar
1 rope/string per plant
Weekly figure-8 wrap
Light pruning for Roma
BED B β Determinate Slicers (NC Winners)
BED B β 4Γ8 β Determinate Slicers (NC Winners)
β North (Back Row)
+------------------------- 8 ft -------------------------+ | | | [Mountain Merit] [Mountain Merit] | | [Mountain Merit] [Mountain Merit] | | | |---------------------------------------------------------| | | | [Mountain Fresh+] [Mountain Fresh+] | | [Amelia F1] [Amelia F1] | | | +---------------------------------------------------------+
Spacing
20β24β between plants
18β between rows
Support
3β4 twine levels
Shorter vertical strings
Pepper Bed (4Γ8) β 2026 Layout
PEPPER BED β 4Γ8 β Sweet Bells & JalapeΓ±os (12 plants)
β North (Back Row)
+------------------------- 8 ft -------------------------+ | | | [Red Knight] [Red Knight] [King Arthur] | | [King Arthur] [Big Bertha] [Big Bertha] | | | |---------------------------------------------------------| | | | [Sweet Banana] [Sweet Banana] [Cal. Wonder 300] | | [Cal. Wonder] [Jalafuego] [Jalafuego] | | | +---------------------------------------------------------+
Spacing
18β between plants
24β between rows
Squash Bed (4Γ8) β 2026 Layout
ZUCCHINI & YELLOW SQUASH β 4Γ8 BED
+------------------------- 8 ft -------------------------+ | | | [Dunja Zucchini] [Dunja Zucchini] | | | |---------------------------------------------------------| | | | [Multipik Yellow] [Multipik Yellow] | | | +---------------------------------------------------------+
Spacing
36β40β between plants
Training
Vertical after 12β18β
Cucumber Trellis Layout (Bed Edges)
CUCUMBERS β Ramp Trellis (2 Bed Edges)
April 20 β May 10 (Round 1)
- Diva Γ 2
- County Fair Improved Γ 2
July 10 β 20 (Round 2)
- Replant Diva Γ 2
- Replant County Fair Γ 2
Notes
Depth: Β½βΒΎβ
Train immediately up trellis
Keep lower 8β10β of vines pruned for airflow
